Industries

Every occupancy burns differently

The hazard classification of a distribution center has nothing in common with that of a corporate office. Neither should the system.

01

Industrial and manufacturing

Production plants, process areas and workshops. The challenge is protecting critical lines and raw material without stopping operations during installation. We work in shutdown windows and by phases when the process cannot stop.

  • Sprinklers per ordinary or extra hazard classification
  • Perimeter hydrant network and fire department connections
  • Special suppression in flammable liquid areas
  • NOM-002-STPS compliance for labor inspections
Get a quote
02

Logistics and distribution centers

The sector with the highest fire load per square meter and the fastest to fall out of compliance: storage only needs to grow taller or change commodity for the original design to stop applying.

  • Rack storage protection and ESFR schemes
  • Design review when storage height changes
  • Pump room sized to real demand
  • Insurer requirements for class A warehouses
Get a quote
03

Retail and commercial

Shopping centers, retail units, anchor stores and common areas. Public occupancy governs here: early detection, notification and egress routes weigh as much as suppression.

  • Sprinklers in sales floors, storage and parking
  • Detection, alarm and voice notification
  • Coordination with local code and center management
  • Maintenance programs with minimal impact on trading hours
Get a quote
04

Corporate and offices

Office buildings and workspaces. The assets to protect are people and operational continuity: reliable detection, orderly evacuation and specific protection of IT infrastructure.

  • Addressable detection with per-floor notification
  • Clean agents in server and communications rooms
  • Standpipes and hose cabinets on every level
  • Integration with access control and HVAC
Get a quote
05

High-rise residential

Apartment towers and mixed-use developments. This is where regulation has tightened fastest, and where the developer needs a system that passes inspection without eating into sellable area.

  • Sprinklers in units, corridors and parking
  • Standpipe, hose cabinets and fire department connection
  • Detection and alarm in common areas
  • Documented handover for occupancy permits
Get a quote

Next step

Have a project, a pending inspection, or a system that no longer complies?

Tell us what the building is and what stage you are in. If we can solve it, we will tell you the scope and investment range. If we cannot, we will tell you that too.

Request a quote Message us on WhatsApp

Reply within 24 business hours